A custody transfer metering skid typically involves multiple instruments, inspection stages, calibration records, fabrication documentation, quality records and client witness requirements. The Factory Acceptance Test (FAT) may also become a release point for downstream activities.
That is why selecting a metering skid vendor should not be treated as a routine procurement exercise. The vendor's ability to control engineering, fabrication, quality documentation, inspection and FAT can directly affect the EPC schedule.